At least, that's what the picture shows. My wife will post the picture later today, but we got photographic evidence showing the brick is on, the fireplace is in, the doors are hung inside, and the cabinets are in. Painting, stain of the concrete, carpet, and countertops are all that remain. Well, and some door knobs need to be put in, I think. I'm guessing those were just taken out for painting, though. The outside only needs the part where the roof hangs over the edge of the brick to be covered. Okay, that and the yard needs to be sodded, but really, I'm excited to see that's such a short list to be finished.
As for moving plans, we made a list of what needs to be done, and we're executing it all this week. We expect to make it to Orlando next week. Things are going at warp speed, but we work well that way. Tomorrow should be a very productive moving day.
-- Robert
Monday, June 8, 2009
Subscribe to:
Post Comments (Atom)
4 comments:
Awesome! Although you'd be amazed how long they can drag some of those details out though.
Oh, and thanks for putting that song in my head. I'll be singing it the rest of the day.
You're most welcome. Those details will not take as long as they might if this was a made-to-my specifications house instead of a cookie-cutter. Also, if I have to help paint the walls in two weeks, I will, because I'm moving in.
The house is coming along.
Yes, yes it is. We're excited.
Post a Comment